WWT FlexShoe Guides 5-1/2in Liner Through Open Hole Sidetrack in Wyoming
Location: Wyoming, USA
Well Type: Land, Horizontal Well
Objective: Run 5-1/2in casing into open hole sidetrack on the first attempt.
Solution: WWT FlexShoe ST
Results: Smooth, efficient casing run.
WWT FlexShoe helps 16” Casing Get to Bottom in Deepwater GOM
Location: Gulf of Mexico
Well Type: Deepwater
Objective: Run 16” Casing in High Inclination Wellbore
Solution: WWT FlexShoe
Results: Casing run to bottom.
WWT FlexShoe with JetGuide Helps 4-1/2in Liner Run Through Window in Oman
Location: Oman
Well Type: Land, Directional Well
Objective: Run 4-1/2in liner though window.
Solution: WWT FlexShoe
Results: Smooth casing run to bottom.
Reduced Torque and Rig Cost due to Non-Rotating Protectors
Location: Permian
Well Type: Horizontal
Objective: Torque Reduction
Solution: WWT SS3‐500 NRPs
Results: Torque and Cost reductions
WWT FlexShoe helps 18” Casing Reach Bottom Efficiently
Location: Gulf of Mexico
Well Type: Deepwater
Objective: Run 18” Casing in High Inclination Wellbore
Solution: WWT FlexShoe
Results: Casing run to bottom with no significant drag.
Conveyance of Coiled Tubing Tool Strings
Sakhalin Island, Russia
Job: 0401
Well Depth: 9,300 meters + TMD
2,600 meters + TVD
Problem: The conveyance of tool stings carrying perforating guns and production logging instruments to TMD beyond that of the coiled tubing helical lock-up point.
Solution: The WWT International Inc. Intervention Tractor, developing 8,500 lbs. of force and installed at the end of the coiled tubing, was able to deliver tool strings to the desired location on 5 runs into the well, accumulating over 4,300 meters of walking distance at up to 17 ft. per minute.
Problem: Operator tried unsuccessfully with competing tractors to perform well cleanout and remove composite bridge plugs to achieve target depth.
Solution: The WWT International CT Tractor was used successfully to convey the coiled tubing beyond lock-up, perform a balldrop and open up a circulation port at TD, and enable milling of composite bridge plugs left over from fracing operations.