Case Study
WWT Europe 6340: 40% Torque Reduction in ERD Well
High Torque and Vibration on ERD
An operator drilling an ERD well encountered high torque and vibration while drilling the 8-1/2” section. A vibration measurement sub was installed on the second run. For the third run the decision was made to install WWT NRPs, covering from surface to the end of the build for torque reduction and mitigation of vibration effects.
WWT NRPs Installed
Torque Decreased by 40% with Reduced Vibrations WWT NRPs model SS-550 were installed on drill pipe and HWDP as shown in the adjacent figure. At TD, torque reached 20kft-lbs, 40% less than the simulated 35.5kft-lbs based on torque trends from Run 2. Vibration measurements also showed significantly less severe readings as shown below.